Hidden roller shutters are roller shutters whose housing box and guide rails are recessed into the opening under the facade finishing: from the outside you see neither the housing box, nor the curtain, nor the lock. This can only be done properly at the facade finishing stage, while the niche for the housing box can still be provided. On a finished building, the honest result is a surface-mounted or built-in housing box.
How hidden roller shutters differ from surface-mounted and built-in ones
Hidden roller shutters differ from surface-mounted and built-in ones in where the housing box with the curtain goes. With hidden ones, the housing box is recessed into the niche of the opening under the facade finishing; with surface-mounted ones, it is fixed over the opening on the outside; and a built-in housing box sits inside the opening and takes up part of its height. From the outside, the difference is immediately visible.
A hidden housing box requires a niche that is provided in advance, at the facade finishing stage. A surface-mounted housing box requires no such preparation — it is mounted on a finished wall. A built-in housing box also does without a niche in the wall, but in return the opening loses height.
Hidden roller shutters give you a facade without surface-mounted parts: no housing box above the window, no grilles, no guide rails on the sides. A surface-mounted housing box leaves a visible box above the opening on the facade. A built-in housing box you see from inside when the curtain is raised.
Hidden roller shutters also have a weak point — access to the mechanism. Everything is concealed, and servicing is more difficult. But that is exactly why hidden roller shutters are chosen by those who care about a clean facade: from the street, the window looks ordinary.
Three types of housing box on one opening
| Housing box type | What is visible from the street | Where the curtain goes | What happens to the opening height |
|---|---|---|---|
| Hidden | Nothing, a facade without surface-mounted parts | Into a niche in the wall | Unchanged, the niche is outside the opening |
| Surface-mounted | Housing box above the opening | Into a housing box above the window | Unchanged |
| Built-in | Clean wall | Into a housing box inside the opening | Takes up part of the opening height |
A surface-mounted housing box is fixed over the opening on the outside, so it is noticeable on both brick and plaster. A hidden housing box goes into the niche of the opening under the finishing — on a finished facade there is no such niche anymore. A built-in housing box in the opening helps when the wall is finished, but you have to pay with the window height.
Why the terms get confused
On the same opening in Almaty, “hidden” and “built-in” are often used as one and the same. In fact, these are different installation options. Jalusso honestly separates them at the measurement: its measurer looks at the facade, the opening and the finishing and says what will actually work in a specific case. It is nicer to hear this before ordering than to see a surface-mounted housing box where you expected a hidden one.
The main thing to take away from this section: a hidden housing box goes into the niche of the opening under the facade finishing, a surface-mounted one is fixed over the opening on the outside, and a built-in one takes up part of the opening height.
At what stage is the hidden housing box installed
The hidden housing box is installed during the facade finishing stage — before the walls are plastered. Earlier, at the design stage, a recess for the box and guide rails is simply added to the drawings. If the facade is already finished, a full installation under plaster is not possible: the hidden housing box requires an open recess where it will be placed and then covered by the finishing.
So the question of “construction or finished facade” is decided not by our capabilities but by the condition of the wall. During the facade finishing stage, hidden roller shutters for windows fit in as standard. On a finished building, you have to choose between a surface-mounted and a built-in housing box. The measurer determines the actual installation option on site — checking the depth of the opening, the evenness of the wall, and where the controls will come out.
Coordinating the recess with the house designer is not mandatory. If the house design already exists, we provide the recess dimensions and they are added to the working drawings — this is more convenient for the builders who are putting up the wall. If there are no drawings, a measurer is enough: he comes with samples and calculates the cost on site. Measurement and consultation are free, and travel within the city is also free.
Here’s how it works.
- Contact via WhatsApp: photo of the opening and the construction stage.
- Measurement: depth of the opening, height of the blind, location of the inspection cover.
- Finishing has not started yet — we fix the recess for the box and guide rails.
- The workshop manufactures the product, installation takes place before plastering.
- The wall is covered with finishing, and the housing box goes inside.
The last point is important: if the plaster is already applied, you cannot go back to the first step. Moreover, redoing a finished facade requires separate work and a separate decision — more on that below.
A full hidden installation is only possible when the facade is not yet finished: the housing box and guide rails are placed in the recess before plastering.
What is placed in the recess in advance
Four elements go into the recess before finishing: the roller shutter housing box with the curtain and mechanism, guide rails on the sides of the opening, insulation around the perimeter, and an inspection cover for access to the mechanism. The housing box and guide rails determine the depth and width of the recess — we provide their dimensions after measurement, because they depend on the height of the curtain. The insulation closes the perimeter so that heat does not escape through the recess in winter. The inspection cover is positioned so that the mechanism can be accessed without opening up the plaster.
The hidden housing box requires the recess to be prepared during the facade finishing stage, and the measurer determines the actual installation option on site.
Finished facade: what you can actually get instead of a hidden installation
On a finished facade, a full hidden installation under plaster, as a rule, is not possible. The reason is simple: a finished facade is an already finished wall, there is nowhere to place a recess for the housing box in it, and no one will break open the plaster for the sake of hidden roller shutters on windows. The recess for the housing box and guide rails is something that goes into the wall before finishing, and it cannot be recreated after the fact. The measurer inspects the opening on site and suggests a realistic option.
What to do if the house construction is already complete but you specifically want a hidden installation? Choose between two workable solutions. The hidden housing box does not take up visible space on the facade, and that is the whole paradox of the situation: you want invisibility, but the available options either remain in plain sight or take away from the height of the opening.
There is one more point. If the facade is already finished but the windows are still being replaced, the hidden housing box still will not fit: installation goes into the opening, not into the wall, and the windowsill assembly has nothing to do with it. You can install any window, but a recess for the housing box will not appear because of it.
Surface-mounted housing box as the closest option in spirit
The surface-mounted housing box is attached over the opening on the outside. The facade is not opened up, and we do not touch the old finishing. The downside is honest: the housing box is visible from the street. Clients often call this a compromise, and I agree with them — you cannot get a facade without surface-mounted parts this way. But in terms of money and timelines, this is the smoothest path.
Built-in housing box in the opening
The built-in housing box goes inside the opening. From the street you get a clean wall, without surface-mounted parts — exactly what people usually aim for when they talk about hidden installation. But the built-in housing box takes away part of the height of the opening: the blind and the housing box are placed within the window dimensions, and the glass area becomes smaller. When is this acceptable? If the opening has height to spare and the loss of a few centimetres is not critical. On floor-to-ceiling panoramic glazing, this option almost always falls away.
On an already finished building, a true plastered hidden installation, as a rule, is not possible; the realistic result is a surface-mounted housing box above the opening or a built-in one in the opening.
The recess for the housing box and what goes into it
The recess for the housing box is a cavity in the opening where the housing box with the curtain and the guide rails go. The size of the recess is determined by two things, and both are calculated before work begins, not after. The first is the housing box itself together with the mechanism: it needs space in the depth of the wall. The second is the height of the raised curtain: when the roller shutters are open, the curtain hangs inside the wall and must not hit the lintel. Hence a simple rule: the taller the opening and the larger the curtain, the deeper and taller the recess for the housing box needs to be. We do not guess the exact dimensions — they come from a measurement of the specific opening.
What physically goes into the wall before finishing:
- the housing box with the roller tube and mechanism, recessed into the cavity;
- guide rails on the sides of the opening, hidden in the wall;
- the facade rail, which covers the recess from the outside and keeps the wall surface flat;
- insulation around the perimeter of the recess;
- an air gap between the window and the blind;
- an inspection cover for access to the mechanism.
Insulating the recess is not a formality. The insulation in the recess prevents a thermal bridge: without it, the wall in that spot freezes through, and cold travels inside along the perimeter of the housing box. The air gap between the window and the blind works like a thermos — it separates the warm glass from the cold edge of the blind and reduces heat loss. With the Almaty winter, with its frosts and daily temperature swings, this matters doubly: at night the metal on the facade cools more than during the day, and a weak spot in the insulation immediately gives itself away.
On top, the recess is covered with decorative plaster, and the facade reads as a flat wall. No surface-mounted part remains on it.
The size of the recess is determined by the housing box and the height of the blind, while insulating the recess and the air gap between the window and the blind reduce the risk of a thermal bridge.
What the measurer checks regarding the recess
The measurer checks four things on site: the depth of the recess, the evenness of the opening, where the inspection cover will go, and how the facade rail will run relative to the future plaster. An uneven opening is common during the finishing stage, and it affects how the rail will sit. Moreover, the depth determines not only how the housing box fits: if there is less space than needed, the blind will hit the wall when raised, and then what is discussed is not a hidden installation but a different option. All of this is determined on site, on the specific opening, not from a photograph.
Profile in the hidden housing box: three versions
The hidden housing box uses the same roller shutter curtain as the surface-mounted one — the type of housing box and the type of profile are two independent things. You choose the profile based on the needs of the opening, not on whether the housing box is hidden in the wall or not. In the hidden housing box we offer three versions.
- Roll-formed foam-filled profile — for apartment and residential windows. Lighter and quieter than the others, the mechanism is less audible in operation.
- Extruded aluminium — protection against break-ins for ground floors and properties without security. Heavier, stiffer, and the mechanism for it is more powerful.
- Perforated profile — light and air pass through the blind, while the opening stays closed during the day. For shop windows where you need to see inside.
The difference between the first and the second is not in the price per metre, but in the weight of the curtain and the load on the roller tube. Extruded aluminium on a wide opening without a reinforced mechanism will sag — we have seen this on projects that others quoted and we finished. Roll-formed foam-filled is the opposite: on an unguarded shop window it won’t give the protection that roller shutters are installed for. See the logic? The profile is chosen for what you are protecting, not for the look of the housing box.
Windows, doors and shop windows
Concealed installation applies not only to windows. On a balcony door-window the housing box hides in the same opening above the lintel, and the blind closes the door tightly. On a shop window or office entrance door the same principle works, only the profile is chosen for the task: perforated — so the shop window reads during the day, extruded — where protection against break-ins is needed. The type of housing box has nothing to do with it, but the guide rails for a door are calculated separately from window ones.
A fact worth remembering: any of the three blind versions fits a concealed housing box — roll-formed foam-filled, extruded aluminium, perforated profile.
Control: facing the street or facing the room
Control facing the room reduces heat loss and is easier to service. Control facing the street means the chain or cardan shaft is brought out to the facade: to close the opening, you go outside. In winter in Almaty that’s an extra trip out into the cold, and the outlet itself becomes a cold bridge — cold is drawn through it inside, to the wall and to the window reveal. The difference shows not in the mechanics, but in where you’ll have to stand in December.
Concealed roller shutters on windows almost always get control from inside the room. And this is not a question of convenience first of all. An outdoor outlet requires a hole in the already finished facade and a separate seal, while an indoor outlet hides in the window reveal and doesn’t disturb the flat wall. A week after installation the difference is forgotten. In freezing weather — it isn’t.
What to choose for your opening is clear from three parameters: the side of the outlet, the type of control, and how you will reach the mechanism if the housing box is closed in. The comparison looks like this.
| Parameter | Control facing the room | Control facing the street |
|---|---|---|
| Heat loss | Lower: the outlet is inside the thermal envelope | Higher: the outlet acts as a cold bridge |
| In winter in Almaty | You close the window without going outside | Every time you go out into the cold |
| Servicing | The mechanism is accessible from inside | Some components are visible from the facade |
| Facade view | The outlet is hidden in the window reveal | The control outlet remains on the wall |
With a concealed housing box, an electric motor is more practical than manual control because of the limited access to the mechanism. The figures for our group are as follows: manual control comes with a coefficient of ×1, chain — ×1.06, electric motor — ×1.85, electric motor with remote control — ×2.1. An electric motor with remote control and sun sensor is priced from 35,000 ₸/m². But don’t rush with the outlet: if the housing box is closed in and you got the side wrong, you won’t be able to redo it without opening up the finish.
Emergency manual lifting works during a power outage — via the cardan shaft. This is the very argument that removes the main objection to automation: without power you are not left with a closed window. In my view, the absence of emergency lifting is the only reason to give up an electric motor.
Manual control in a concealed housing box
Manual control in a concealed housing box is appropriate where the opening is not tall and opens rarely: kitchen, kids’ room, balcony door-window. The chain or cord is brought out towards the room, through the window reveal, next to the window. The housing box itself stays invisible from the street — the outlet is hidden inside. If the blind is heavy, for example extruded aluminium, manual control quickly gets tiresome: you’ll have to pull with effort, and the mechanism wears out faster.
Control facing the room reduces heat loss, and with a concealed housing box an electric motor is more practical than manual control because of the limited access to the mechanism; emergency manual lifting works during a power outage.
How much concealed roller shutters cost in Almaty
We don’t have a separate price specifically for a concealed housing box. The profile for it comes from the general roller shutter price list, so the cost is calculated by the area of the curtain and the type of control, not by the type of housing box. What does change: concealed roller shutters require a niche to be built at the facade finishing stage, and this work is done not by our workshop but by the construction crew handling the facade.
| Position | Price | Lead time |
|---|---|---|
| Roller shutters on windows, roll-formed foam-filled profile, mechanical mechanism included | from 17,500 ₸/m² | 10–14 days |
| Protective roller shutters, extruded aluminium — shop windows, garages, ground floors | from 24,900 ₸/m² | 12–16 days |
| Perforated roller shutters, perforated profile — the shop window is visible, air passes through | from 27,800 ₸/m² | 12–16 days |
| Roller shutters with an electric motor — motor, remote control, emergency lifting, schedule and sun sensor | from 35,000 ₸/m² | 14–18 days |
Installation costs 4,500 ₸ per unit. For orders from 150,000 ₸ we install free of charge. Measurement and delivery within the city are always free; we travel to the suburbs for a fee that we quote before the visit.
What makes up the price
The price is made up of four parts: blind, housing box, control and installation. The blind is calculated by area — roll-formed foam-filled profile is cheaper, extruded aluminium and perforated are more expensive, because it’s a different material and a different task. Control changes the price through a coefficient: chain gives ×1.06, electric motor ×1.85, electric motor with remote control ×2.1. Installation is also calculated with a coefficient — onto a wall ×1, onto a frame ×1.05, without drilling ×1.1, cassette system ×1.28. The housing box is not listed as a separate line in the calculator.
In practice it looks like this. A kitchen window with a vent pane, the housing box goes into a niche under the finish, manual control — we calculate by the area of the blind and the base installation coefficient. Add an electric motor with remote control — the same area is multiplied by 2.1, and the difference in price comes precisely from the control, not from the housing box. What’s more, the measurer gives the figure on site: the depth of the opening, the evenness of the window reveals and the space for the niche are only visible on the spot.
Why there is no separate price “for concealment”
The profile for a concealed housing box comes from the same price list as for a surface-mounted one. Roll-formed foam-filled, extruded aluminium or perforated — any of the three versions can be recessed into the opening, and none of them becomes more expensive just because of the type of housing box. The markup comes from the area, the blind material and the automation.
The measurer determines the actual installation option on site and calculates the cost from it. A concealed housing box requires a niche to be built at the facade finishing stage — if that stage is already done, the option changes, and the estimate with it.
Access panel and mechanism servicing
The inspection cover provides access to the mechanism once the housing box has been finished over. It is not a hatch in the wall that you have to hunt for — it is a removable panel on the housing box itself, disguised as the finished surface. It opens from inside the room: the roller tube, bearings, limit switches and fabric attachment stay within arm's reach. Inspection access to the mechanism is planned in from the start — it is not cut out of finished plaster later.
Will the plaster above the housing box crack? The mechanism itself does not vibrate the structure — the blind runs along the guide rails rather than hitting the wall. But the day-night temperature swing in Almaty works differently: if the layer of finish above the housing box is thin and unreinforced, it can develop cracks along the seam over time. That is why our measurer looks not only at the depth of the recess but also at what will cover the housing box and how. This is one of those cases where an extra centimetre of reinforcing mesh above the recess matters more than the grade of plaster.
What really wears out the mechanism in a concealed housing box:
- debris in the guide rails — dust, leaves, sand after wind; it is clogged guide rails that cause the mechanism to jam, not frost, as people usually think;
- the blind skewing after a sharp yank on the chain or cord;
- loosened housing box fasteners after seasonal movement — tightened up in a single visit.
On the warranty, I will be direct: the warranty on the mechanism applies regardless of whether the housing box is concealed under the finish or surface-mounted. Our 3 years on the mechanism and 1 year on installation from the date the acceptance report is signed also cover concealed installation. If a case is recognised as a warranty case, we carry out the work free of charge — it takes up to 5 working days. Mechanical damage, reinstallation on your own, water and natural fading of the fabric are not covered — and this does not depend on the type of housing box.
What we do after the warranty
After the warranty period we still come out: to tighten, adjust, replace a cord or chain. The concealed cover is made for exactly this — you can remove the panel, reach the roller tube and get everything back into working order without opening up the facade. In my view, access to the mechanism matters more than how deeply the housing box is recessed: a beautifully hidden roller shutter with no way to reach it costs more to maintain.
Almaty's climate and the recess for a concealed housing box
Almaty's climate for concealed roller shutters on windows is sharply continental: frost and a big day-night temperature swing in winter, heat, sun and dust in summer. A concealed housing box handles these conditions more gently than a surface-mounted one.
Here is why. A housing box inside the opening reduces freezing of the edge in winter: the blind goes into the wall rather than hanging outside, where the edge would freeze to the guide rail. With a surface-mounted housing box the edge stays outside — with a concealed one it stays in the warmth of the opening. The air gap between the window and the blind acts as a thermos and also dampens street noise. How much exactly depends on the thickness of the gap and on how well the recess is insulated.
The thermal bridge is the main risk. The recess for the housing box is a hollow in the wall, and if it is not insulated, the cold will travel through the concrete into the room. Insulation in the recess breaks that path. And at the measurement we look not only at the depth of the opening but also at how it is insulated: without that, concealed installation will give you a cold wall near the window.
Is concealed installation in Almaty realistic at the facade finishing stage? Yes, if the recess is planned before plastering — the housing box and guide rails go into the wall together with the windows. On a finished facade that is no longer possible, and Jalusso says so straight away, not after signing.
Debris in the guide rails causes the mechanism to jam — this is about dust, not frost. Summer dust and small debris pack into the groove, the blind runs stiffly, and the owner decides the mechanism has frozen. In fact it needs cleaning.
Care during the dusty season
The roller shutter fabric and guide rails just need wiping and the groove cleaned out — without dismantling the housing box, access is through the opening. The inspection cover does not need to be opened for this.
Want to check your opening? Our measurer comes with samples and names the installation option on site.
With a concealed housing box the edge of the blind does not stay outside as it does with a surface-mounted one, so freezing is less of an issue, and jamming is more often caused by debris in the guide rails.
How ordering works: from measurement to installation
The recess for the housing box is a question settled not with the building's designer but with our measurer on site. Of course, if the facade design is already in progress, it is useful to pass the recess data to the architect — but we mark out the recess ourselves, based on the actual opening. The procedure is as follows:
- You message us on WhatsApp, describe the site: the stage of construction, the type of opening, what you want to achieve from the street.
- A measurer comes with samples. He looks at the opening, the evenness of the wall, where the housing box will go, and calculates the cost on site. Measurement and consultation are always free, within the city — together with delivery.
- The measurer names the realistic installation option. A concealed housing box requires the recess to be planned at the facade finishing stage; if the facade is already finished, he will honestly say what is possible — a surface-mounted or a built-in housing box.
- The workshop manufactures the product to the measured dimensions, then installation follows. Installation is 4,500 ₸ per item; for orders from 150,000 ₸ it is free.
We travel to the suburbs — Kaskelen, Talgar, Issyk, Kapshagay — and we quote the call-out cost before the visit so it does not come as a surprise. As for a window that is already in place: it does not have to be replaced together with the housing box. The roller shutter fabric fits into the opening without replacing the window — the only question is where the housing box will go: into a recess under the finish or outside. If space in the opening is tight, we add an extension profile. In our experience, this is worked out at the measurement within fifteen minutes, and the conversation immediately turns to a specific option rather than theory.
Measurement and consultation are free, the measurer comes with samples and calculates the cost on site: within the city measurement and delivery are free, to the suburbs we travel for a separate fee, which we quote before the visit.
What to prepare for the measurement
Drawings of the opening, the stage of construction, your preferences for operation. That is enough for the measurer to immediately name the housing box option — concealed, surface-mounted or built-in — and calculate the price.
Case studies
We have done concealed installation on both windows and balcony doors. The scheme is the same everywhere: the housing box with the blind is built into the opening at the moment when the windows are still being installed — before plastering and finishing. After that the facade is closed up, and from the street all you see is a flat wall.
Of the eight projects, two are the most telling. In an apartment and in a private house, the housing box was built into the opening together with the windows, from the very start. Nothing had to be redone there: the recess appeared before the walls got their finish. This is the case where concealed roller shutters on windows are concealed in the full sense — you see neither the housing box, nor the guide rails, nor the tape.
The other two projects were an office and a living room without security. There we installed extruded aluminium in a concealed housing box, without an alarm system. Extruded aluminium protects ground floors and sites without security — in terms of rigidity and resistance to break-in, it is not a foam-filled roll-formed profile. What is interesting: the customers came specifically for the invisible housing box, not for protection as such, and got both at once.
Concealed installation also works for doors and shopfronts. The profile is simply chosen to suit the task: for a balcony door it makes sense to use a roll-formed foam-filled one — it is lighter and quieter in operation; for a shopfront or ground floor, extruded.
The timelines for these cases are 10–14 days, and one project with extruded profile — 12–16 days.
A hidden housing box takes up no visible space on the facade, and that is its main difference from a surface-mounted one — not cosmetics, but the very logic of installation.
Bedroom, kitchen, kids’ room and balcony door-window
In the bedroom, kitchen, kids’ room and on the balcony door-window, the control is brought out towards the room. The housing box is not visible either from the street or from inside the room. On these sites, an electric motor is more convenient than manual control: the mechanism is hidden, and there is no point reaching for a chain across an insulated window reveal. Plus, emergency manual lifting works during a power cut — you can’t rely entirely on electronics in a house, and here in Almaty outages do happen.
FAQ
A hidden housing box requires a recess to be provided at the facade finishing stage — this is the main thing that determines the answers to most questions about hidden roller shutters. Below are the ones asked most often before measurement.
Question: can a hidden housing box be installed on a finished house? Answer: a full hidden installation under plaster — no. On an already finished facade, the measurer will suggest a surface-mounted housing box over the opening or one built into the opening: a built-in one takes up part of the height, but from the street the wall stays clean.
Question: which profile do you install in a hidden housing box? Answer: any of the three — roll-formed foam-filled, extruded aluminium, perforated. For an apartment and a residential house, the foam-filled one is usually chosen; for ground floors without security, extruded.
Question: is an electric motor mandatory for hidden roller shutters? Answer: no, manual control works. But with a hidden housing box the mechanism is concealed, and it is harder to reach the chain or cord — an electric motor with a remote control is more practical in this setup. Emergency manual lifting via a crank remains in any variant.
Question: do I need the house designer to approve the recess? Answer: our measurer is enough. He comes to the site, looks at the opening and says which installation variant will actually fit. The recess for the housing box is a matter for the measurer, not the designer.
Question: how much does hidden installation cost? Answer: there is no separate price for hiddenness. Roller shutters for windows made of roll-formed foam-filled profile — from 17,500 ₸/m², with an electric motor — from 35,000 ₸/m². Measurement is free.
Question: how do you service the mechanism if the housing box is under the finish? Answer: an inspection cover provides access to the mechanism. Through it we tighten the blind, lubricate the components, and clear debris from the guide rails.
Warranty questions
Question: what does the warranty cover? Answer: 3 years on the mechanism, 1 year on installation from the date the acceptance report is signed. If the situation is recognised as a warranty case, we do the work free of charge — it will take no more than 5 working days.
Question: does a hidden housing box affect the warranty in any way? Answer: no. The warranty on the mechanism applies regardless of whether the housing box is hidden or not.
Question: what is not covered by the warranty? Answer: mechanical damage, reinstallation on your own, water and natural fading of the fabric.
Question: will you come after the warranty period? Answer: yes. Tighten, adjust, replace a cord or chain — we come after the warranty too.
The bottom line
Hidden roller shutters in Almaty can genuinely be done, but not on every site and not at every stage of work. Below are five conclusions we repeat to customers most often.
The hidden housing box goes into a recess in the opening under the facade finish. From outside, neither the housing box, nor the guide rails, nor the control tape is visible — the window looks like an ordinary one.
A full hidden installation under plaster is only possible at the facade finishing stage. The housing box and guide rails are built into the recess before plastering, and this is the only window when you get exactly the result the customer imagines.
On a finished facade, the honest result is a surface-mounted housing box over the opening or one built into the opening. A surface-mounted one is cheaper and does not require opening up the facade; a built-in one takes up part of the opening’s height, but from the street you see a clean wall.
Any of the three profiles goes into a hidden housing box: roll-formed foam-filled for windows of apartments and residential houses, extruded aluminium for ground floors and sites without security, perforated — where light and air are needed. The type of housing box and the type of profile are two independent things, and they are selected separately.
It is wiser to bring the control out towards the room: less heat loss, and the mechanism is more accessible for servicing. With a hidden housing box, an electric motor is more practical than manual control, because access to the mechanism is limited; emergency manual lifting via a crank works during a power cut.
There is one practical recommendation: if you have not yet closed up the facade with the finish, call the measurer now, while the recess for the housing box can still be provided. Measurement and consultation are free, the measurer comes with samples and calculates the cost on site; within the city, measurement and delivery are also free, and to the suburbs — Kaskelen, Talgar, Issyk, Kapshagay — we travel for a fee that we state before the visit. If the facade is already finished, we will not promise a hidden installation: we will look at the opening and suggest a surface-mounted or built-in variant.











































